Rectory Basement Remodel Progress

Many Thanks to All the Helpers That Donated Their Time and Expertise to Complete This Renovation!

Project is Complete in About Two Months!

Scroll Down to See the Entire Renovation of the Rectory Basement

Steps and Railings, Furniture and Cabinets

Photos from 11-12-23

Photos from 10-19-2023

—–

Completed Interior Remodel Images

Photos from September 21, 2023

—–

Doing the finishing Trim and Detail Touch Up

Photos from September 18th

——

Painting, Outside Steps, Sidewalk, Flooring Photos

The below photos show status as of September 7, 8, 12 and 14, 2023

———

Drywall Install Photos

The below photos show status as of August 23, 2023

——

Insulation Install and Drywall Delivery Photos

The below photos show status as of August 12, 2023

——–

Stud Wall Install Photos

The below photos show status as of August 4, 2023