Many Thanks to All the Helpers That Donated Their Time and Expertise to Complete This Renovation!
Entire Project was Completed in About Two Months!
Scroll Down to See the Entire Renovation of the Rectory Basement
Steps and Railings, Furniture and Cabinets
Photos from 11-12-23
Photos from 10-19-2023
—–
Completed Interior Remodel Images
Photos from September 21, 2023
—–
Doing the finishing Trim and Detail Touch Up
Photos from September 18th
——
Painting, Outside Steps, Sidewalk, Flooring Photos
The below photos show status as of September 7, 8, 12 and 14, 2023
———
Drywall Install Photos
The below photos show status as of August 23, 2023
——
Insulation Install and Drywall Delivery Photos
The below photos show status as of August 12, 2023
——–
Stud Wall Install Photos
The below photos show status as of August 4, 2023